Gold Member Since 2016
Audited Supplier
Wuyi Sanhe Industry and Trade Co., Ltd.

Stainless Steel Strip, Stainless Steel Sheet, Stainless Steel Product manufacturer / supplier in China, offering Stainless Steel Cold Rolled Strip, Grade 430 Cold Roller Stainless Steel Coil, Competitive Price and Can Design Coilgalvalume Steel Coil and so on.

(/ )

Supplier Homepage Product 430 stainless steel coil Stainless Steel Cold Rolled Strip

Stainless Steel Cold Rolled Strip

FOB Price: US $1,050 / Ton
Min. Order: 25 Tons
Min. Order FOB Price
25 Tons US $1,050/ Ton
Get Latest Price
Production Capacity: 4500tons/Month
Transport Package: Good Export Packing
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Se-430
  • Certification: ISO9001, ASTM
  • Grade: 4000 Series
  • Surface Treatment: Polished
  • HS Code: 72193500, 72193500
  • Delivery Time: Within 15-30days
  • Specification: Thickness: 0.18mm-2.0mm
  • Application: Transportation Tools, Door & Window, Glass Wall
  • Technique: Cold Drawn
  • Temper: O - H112
  • Alloy: Non-alloy
  • Shipment: Fob/CFR/CIF/EXW
  • Trademark: Customers owner
  • Origin: Zhejiang, Jinhua
Product Description

Stainless Steel Cold Rolled Strip



Stainless Steel Product Description

Stainless Steel Cold Rolled Strip

Company profile

   Zhejiang Sanhe industry&Trade  Co., Ltd. is a professional production of stainless steel products manufacturers. The main products include various type of stainless steel coil such as 410, 409, 430. The production can be used in various dinner set, kitchen ware, frame of security door, auto vent-pipe, vacuum cup, clean bucket water sink and so on.ed.


Product sample
Stainless Steel Cold Rolled Strip
Workshop

Stainless Steel Cold Rolled StripStainless Steel Cold Rolled Strip

Stainless Steel Cold Rolled Strip
FAQ
 :

1. Can I bargain the price?

   Yes. The price list is our general price, we can look for a win-win price

 

2. What is your minimum order quantity? 

   14MT for 20GP

 

3. Do you have products in stock? 

   Sorry. If there is any, we will inform you timely.

 

4. How long dose it take to finish my order?

   It depends on your quantity and complexity of your cabinet. 

   Generally 20days for one 20GP, 30days for one 40HQ.

If you are interested in our products, please feel free to contact us for more details. Really hope to have pleased and solid business cooperation with you!

Send your message to this supplier
Avatar
Mr. Zheng
manager
*From:
To: Mr. Zheng
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now